Office space

MAISON DES LOISIRS ET DES SPORTS

Year of construction

2020 – 2023

City, Province

Montreal, QC

Number of floors

5

Mandate description

The mandate consisted of drafting the electromechanical plans and specifications for the Base Building and design of the layout:
▪ A 5-storey office building
▪ A 65,000 ft² underground parking garage
▪ The integration of the Société Québécoise des Infrastructures (SQI)
The design of electromechanical systems to meet LEED® requirements for LEED v4 ID+C: Gold certification.

Services provided

  • Detailed design calculations
  • Coordination among disciplines
  • Issuance of drawings and specifications for permits and tender
  • Preparation support for LEED certification
  • Preparation of construction cost estimates and tender slip
  • Construction cost estimates
  • Support during the call for tender period
  • Support during construction

More beautiful projects